Guide
How long should a shed ramp be?
Multiply the floor height by the slope. For wheelbarrows and mowers we suggest 1 in 4: every inch of height takes 4 inches of ramp, about 14 degrees. Our shed floors on skids sit 11-3/4" above the gravel, so the ramp runs about 3' 11". On concrete blocks the floor is 19-3/4" up and the same slope runs 6' 7".
Gentler is easier to push a load up. A wheelchair ramp is held to 1 in 12, which needs 11' 9" of ramp for the same skid floor. Steeper than 1 in 3 is hard to walk down with anything in your hands.
- The rule
- ramp length = floor height x slope (1 in 4: height x 4)
- Our floor on skids
- 11-3/4" up, ramp 3' 11" at 1 in 4
- Our floor on blocks
- 19-3/4" up, ramp 6' 7" at 1 in 4
- Wheelchair (ADA)
- 1 in 12 at most, 4.8°
Shed ramp length chart
Measure the floor height from the ground where the ramp will start up to the top of the shed floor, at the door. The slope is rise over run: "1 in 4" means one inch up for every four inches along the ground. The table gives the run, the distance the ramp reaches out from the door.
| Floor height | 1 in 12 (4.8°) | 1 in 8 (7.1°) | 1 in 6 (9.5°) | 1 in 4 (14°) | 1 in 3 (18.4°) |
|---|---|---|---|---|---|
| Skids 11-3/4" | 11' 9" | 7' 10" | 5' 11" | 3' 11" | 2' 11" |
| Blocks 19-3/4" | 19' 9" | 13' 2" | 9' 11" | 6' 7" | 4' 11" |
| 6" | 6' 0" | 4' 0" | 3' 0" | 2' 0" | 1' 6" |
| 8" | 8' 0" | 5' 4" | 4' 0" | 2' 8" | 2' 0" |
| 10" | 10' 0" | 6' 8" | 5' 0" | 3' 4" | 2' 6" |
| 14" | 14' 0" | 9' 4" | 7' 0" | 4' 8" | 3' 6" |
| 16" | 16' 0" | 10' 8" | 8' 0" | 5' 4" | 4' 0" |
| 18" | 18' 0" | 12' 0" | 9' 0" | 6' 0" | 4' 6" |
| 24" | 24' 0" | 16' 0" | 12' 0" | 8' 0" | 6' 0" |
Our floor heights add up the parts in our plans: a treated 4x6 skid on edge (5-1/2"), a 2x6 floor joist (5-1/2") and the 3/4" floor panel. Every plan size, from 4x8 to 16x20, frames its floor this way, so every size has the same height. Concrete blocks add two 4-inch blocks under each beam, 8" more. If your gravel pad stands proud of the lawn, measure from the lawn where the ramp lands.
Which slope for which job
- 1 in 12 (4.8°): wheelchairs and walkers. The 2010 ADA Standards set 1:12 as the steepest ramp slope for a public route, with handrails on ramps that rise more than 6 inches. A private shed does not have to meet them, but if someone in a wheelchair uses yours, this is the slope to build.
- 1 in 8 or 1 in 6 (7.1° to 9.5°): heavy carts and hand trucks. Easier to push a loaded cart up, and less likely to tip a tall load. Takes a long ramp: 5' 11" at 1 in 6 for our skid floor.
- 1 in 4 (14°): wheelbarrows, push mowers and riding mowers. Our suggestion for most sheds: short enough to fit in front of the door, gentle enough to wheel a full barrow up.
- 1 in 3 (18.4°): the steepest we would build. Fine for a light push mower or for walking in, but awkward going down with a load.
Riding mowers and zero-turns are the case to check. Their manuals give the steepest slope they may be driven on, often 15 degrees or less and on some models 10. A 1 in 4 ramp is 14°, so read your mower's manual before you build. If it says 10 degrees, build 1 in 6 (9.5°). Back a rear-heavy ride-on up the ramp if the manual says to.
How long are the ramp boards?
The run is measured along the ground, but the stringers (the sloping boards under the deck) are a little longer, because they climb as well. Cut each stringer with a level cut at the bottom where it rests on the ground and a plumb cut at the top where it meets the shed.
| Ramp | Runs along the ground | Stringer length | Board to buy |
|---|---|---|---|
| Skids, 1 in 4 | 3' 11" | 4' 0" | 6' |
| Skids, 1 in 3 | 2' 11" | 3' 1" | 4' |
| Skids, 1 in 6 | 5' 11" | 5' 11" | 8' |
| Blocks, 1 in 4 | 6' 7" | 6' 9" | 8' |
| Blocks, 1 in 6 | 9' 11" | 10' 0" | 12' |
Our plans frame the shed floor with PT 2x6 joists at 16 inches on center. Under a storage floor load, a 2x6 at 16 inches spans up to 8' 6" between supports and a 2x8 up to 10' 9". A mower puts its weight on four small tire patches, not spread out like a load of boxes. So we keep ramp stringers well short of those spans: on any ramp longer than 4 feet, add a treated block or a short sleeper under the middle of the stringers.
How wide should a shed ramp be?
As wide as the door opening, so you never have to steer a wheel along the edge. With double doors, make the ramp the full width of both leaves: measure your mower's widest point, usually the cutting deck, and add a few inches each side.
| Door | Rough opening | Ramp width |
|---|---|---|
| 38" single | 38" | 3' 2" |
| 44" single | 44" | 3' 8" |
| 62" double | 62" | 5' 2" |
| 74" double | 74" | 6' 2" |
Set stringers at 16 inches on center across that width, with one at each edge, and deck the ramp with treated 2x6 boards running across the slope. Leave a 1/8-inch gap between boards for water to drain. For grip, screw a treated 1x2 cleat across the deck every 8 to 12 inches, or use grooved decking. A wet, smooth ramp is the slippery part of any shed.
Building a shed ramp, step by step
- Measure the height at the door, from the ground where the ramp will land to the top of the floor.
- Choose the slope and work out the run (height x slope). Check you have that much level ground in front of the door.
- Cut one stringer as a pattern: lay a board against the shed at the right run, mark the plumb cut against the rim joist and the level cut on the ground, then cut the rest to match.
- Fix the top to the shed's rim or band joist with a treated ledger and joist hangers, or with structural screws through the stringers. Keep the top of the decking flush with the shed floor, so nothing catches at the threshold.
- Support the bottom on a treated sleeper set in the gravel, or on a paver, so the stringer end is not sitting in mud.
- Deck it with treated boards across the stringers, gaps for drainage, cleats or grooves for grip.
A shed on skids can move a little with frost and settling. A ramp fixed rigidly at both ends can crack its fasteners, so let the bottom rest on its sleeper rather than anchoring it to the ground.
Can you make the ramp shorter?
The ramp is only as long as the floor is high, so a lower floor means a shorter ramp. Our plans' skid floor is already about as low as a wood floor should sit. Ground-contact lumber needs air and drainage under it, and the stone pad keeps the skids out of standing water. Sinking the pad so the floor is lower brings water and soil up against the frame. If you need a short ramp, build it steeper and add cleats, or build the ramp at 1 in 4 and put a small level landing at the door. A concrete-block foundation on sloping ground can put the downhill door higher still: put the door on the uphill wall if you can.
Questions people ask
How long should a ramp be for a shed?
Floor height times the slope. At 1 in 4, a floor 11-3/4" up (our plans on skids) needs about 3' 11" of ramp; on concrete blocks (19-3/4") about 6' 7".
What angle should a shed ramp be?
About 14 degrees (1 in 4) for wheelbarrows and mowers, gentler (1 in 6 is 9.5°) for heavy carts, and 1 in 12 (4.8°) for wheelchairs.
What slope can a riding mower or zero-turn go up?
It depends on the model: the manual gives its limit, often 15 degrees or less and sometimes 10. A 1 in 4 ramp is 14°; build 1 in 6 (9.5°) if your mower's limit is 10 degrees.
How wide should a shed ramp be?
The full width of the door opening. Our 62-inch double door gets a 62-inch ramp. Check it against your mower's widest point, usually the cutting deck.
How high is a shed floor off the ground?
In our plans, 11-3/4" above the gravel on skids (skid, 2x6 joist and floor panel) and 19-3/4" on concrete blocks.
What wood should I use for a shed ramp?
Ground-contact treated lumber for the stringers and the sleeper at the bottom, and treated 2x6 or grooved decking across the top, fixed with screws rated for treated lumber.
Plan the shed and its door together
The free materials calculator lets you choose the foundation and the door for any size, and lists every board. The 10x12 gable shed plans include the floor framing the ramp attaches to.
Sources
- U.S. Access Board, 2010 ADA Standards for Accessible Design, 405 Ramps: 1:12 steepest ramp slope, handrails over a 6-inch rise
- American Wood Council, 2024 Span Tables for Joists and Rafters: the span method behind our stringer figures
- American Wood Protection Association, information for homeowners: ground contact lumber (UC4A) for wood near or on the ground
- California Residential Code (2021 IRC text), Section R502 Wood floor framing: floor joist spans and framing
Our plans and these guides follow common light-frame building practice and are a guide, not drawings stamped for your site: check your local codes, permit rules and HOA before you build.